The 6th International Underwater Salvage and Marine Engineering Equipment Exhibition officially opened on November 9, 2023 at the Xiamen Flying Dragon Exhibition Center. Zhengli Marine Engineering was invited to bring new equipment and achievements to the exhibition, communicate with partners in the industry, and jointly promote the green, low-carbon, and high-quality development of the industry economy.
Themed "Consolidating Industry Strength and Serving High-quality Development of Marine Economy", the exhibition is the most influential brand exhibition in the field of diving salvage and marine engineering in China. Approved by the Ministry of Commerce, the exhibition is jointly organized by China Diving Salvage Industry Association (CDSA), International Diving Contractors Association (ADCI), and International Maritime Contractors Association (IMCA). It will hold one high-value international forum, five themed exchange meetings among exhibitors, buyers, experts and scholars in different fields, and gather more than 30 industry experts and guests to attend and speak.
With the concept of "One belt, one road", Zhengli Marine Engineering focused on introducing the company's achievements and future plans in five areas: ship equipment, offshore wind power construction, cross-strait integration and development, integration of production, education and research, and the integration of wind, fishing and tourism.
Introduction to the functions of the 3500-ton self-elevating and self-propelled offshore wind power installation platform of Zhengli Marine Engineering
1. Large lifting capacity: It is currently the world's largest wind turbine installation vessel with the largest lifting capacity, and can install all current wind turbine models.
2. Innovative integrated performance of drilling and hoisting: leading the industry and realizing the integrated operation of drilling and hoisting,
3. It can optimize the construction organization sequence to the greatest extent, and adjust the order of foundation construction and wind turbine hoisting in a timely manner according to the actual situation of foundation supply and wind turbine supply.
The large deck area, strong load capacity, and comprehensive functions of high-speed self-propulsion can enable direct access to the dock for loading multiple sets of wind turbines in the future (European solution), while also providing the function of a transport vessel for self-propelled installation operations at the wind farm.
5. DP2 positioning and excellent wind and wave resistance: It has excellent wind and wave resistance, without anchoring, and can still safely construct under complex sea conditions.
6. Widely applicable: The operating depth of up to 70 meters allows it to be used in multiple fields, including wind power engineering, bridge construction, drilling platforms, etc., with dual classification certification.
Advanced technology: 136-meter pile leg length, equipped with DP2 dynamic positioning and large pile-holding device, with strong adaptability to sea conditions.
8. Long-term life cycle: It has long-term use potential and will completely change the standards and benefits of future wind power projects.
Zhengli Marine Engineering Co., Ltd.
The address:30th Floor, Building 1 (Intelligent Industry
Building), Jinjing Bay Business Operation Center, Pingtan Comprehensive Experimental Zone, Fujian Province
Phone call:+86 591 8798837
Email address:zl@zloffshore.com
CopyRight © 2020 Zhengli Marine Engineering Co., Ltd. 闽ICP备17007219号 Technical Support: Baizhu Website